Since April 22, 2021, there have been 2 checks on the accessibility of pullmanproject.com over 1 307 days as shown in the report. Operational in 2 instances throughout checks, pullmanproject.com's last uptime on November 19, 2024, responded with a code 200. According to checks performed as of November 19, 2024, there have been no instances of the inoperability of pullmanproject.com. There are no responses with an error status, according to all replies received as of November 19, 2024. Pullmanproject.com replied in 0.458 seconds on November 19, 2024, while averaging a response time of 0.388 seconds.