Analyzing the data indicates planificacion.gob.ec passed 1 availability tests within the 88 day duration from August 22, 2024. The latest uptime on August 22, 2024, resulted in a code 200, indicating that planificacion.gob.ec was operational in 1 instances across all tests. Checks that were done as of November 19, 2024, show that planificacion.gob.ec was never unavailable. Based on all of the replies that have been received, as of November 19, 2024, there have not been any recorded responses with an error status. Planificacion.gob.ec's August 22, 2024, response time of 3.701 seconds differed from its 3.701 seconds average response time.