There were 1 uptime checks conducted for preptheproject.com in the 2 118 days after February 7, 2019. Preptheproject.com responded with a code 200 on February 7, 2019, the latest of 1 times the site was operational based on total checks performed. There were no offline periods for preptheproject.com as of November 26, 2024, according to all inspection results. As of November 26, 2024, all replies received affirm that there are no responses with an error status. On February 7, 2019, preptheproject.com's response time contrasted its average, being 1.049 seconds against 1.049 seconds.